A. Fields: construction investment, trading in infrastructure for industrial zones; urban, service and residential areas for industrial zones; economic zones and other residential areas (9 projects)).
1. Investment in the trading of infrastructure for Hoa Trung Industrial Zone.
- Location: Hoa Trung Industrial Zone, Luong The Tran Commune, Cai Nuoc District, Ca Mau Province.
- Scale: 58ha.
- Objectives of the project: Construction investment of synchronous technical infrastructure for industrial zone to respond to the demand of secondary investment projects in the zone in following fields: processing fishery products for export; food and foodstuff processing industry; bio-materials; food for aquaculture and supporting industries; processing; exploitation and manufacture of construction materials; warehousing services; and so on.
- Total investment capital (estimated): 400 billion dong.
- Form of investment: Using 100% foreign invested capital or owner's capital.
- Unit proposes the project: Management Board of Economic Zones of Ca Mau Province.
2. Investment in the trading of infrastructure for Song Doc Industrial Zone - Industrial Cluster No.I.
- Location: Song Doc Town, Tran Van Thoi District, Ca Mau Province.
- Scale: 45.45 ha.
- Objectives of the project: Construction investment of synchronous technical infrastructure for industrial zone to respond to the demand of secondary investment projects in the zone in following fields: aqua-cultural food processing; manufacture of food for farming shrimp and aqua-cultural products; construction of repair and shipbuilding service factory for aquaculture, construction of high-load yachts made of new materials, and manufacture of agriculture farming net and tools.
- Total investment capital (estimated): 400 billion dong.
- Form of investment: Using 100% foreign invested capital or owner's capital.
- Unit proposes project: Management Board of Economic Zone of Ca Mau Province.
3. Investment in the trading of infrastructure for Song Doc Industrial Zone - South Side.
- Location: Khanh Hai Commune and Song Doc Town, Tran Van Thoi District, Ca Mau Province.
- Scale: 200ha.
- Objectives of the project: Construction investment of synchronous technical infrastructure for industrial zone to respond to the demand of secondary investment projects in the zone in following fields: aqua-cultural food processing; manufacture of food for farming shrimp and aqua-cultural products; construction of repair and shipbuilding service factory for aquaculture, construction of high-load yacht made of new materials and manufacture of agriculture of farming net and tools.
- Total investment capital (estimated): 1,000 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Unit proposes project: Management Board of Economic Zones of Ca Mau Province.
4. Investment in the trading of infrastructure for Khanh An Industrial Zone.
- Location: Khanh An Commune, U Minh District, Ca Mau Province.
- Scale: 360ha.
- Summary of objectives of the project: Construction investment of synchronous technical infrastructure for industrial zone to respond to the demand of secondary investment projects in the zone in following fields: low-pressure gas, supporting industries, oil and gas, liquefied gas and wood processing and hi-tech construction material industries.
- Total investment capital (estimated): 1,000 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Unit proposes project: Management Board of Economic Zones of Ca Mau Province.
5. Khanh An Service - Technical Port Zone Investment Project.
- Location: Khanh An Commune, U Minh District, Ca Mau Province.
- Total investment capital (estimated): 500 billion dong.
- Scale: 64ha.
- Objectives of the project: Construction investment of technical infrastructure of Khanh An Servive Port Zone. Objectives: to set up a port terminal for transit of goods, materials, construction materials and machine, equipment for Khanh An Industrial Zone, Khanh An Urban Area and a part of Ca Mau City and adjacent districts.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Unit proposes project: Management Board of Economic Zones of Ca Mau Province.
6. Investment in Nam Can Resettlement, Urban, Service and Trading - Economic Zone.
- Location: Nam Can Town, Nam Can District, Ca Mau Province.
- Scale: 620ha.
- Objectives of the project: Development of resettlement and residential area for specialists, normal workers, construction of new urban area and service trade center for functional segments of Nam Can Economic Zone.
- Total investment capital (estimated): 4,000 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Unit proposes project: Management Board of Economic Zones of Ca Mau Province.
7. Construction investment of the infrastructure of Free Duty Area of Nam Can Economic Zone.
- Location: Nam Can Town, Nam Can District, Ca Mau Province.
- Scale: 1,050ha.
- Summary of objectives of the project: Construction investment of synchronous technical infrastructure of to respond to the demand of secondary investment projects in Nam Can Economic Zone in industral - trade - service zone.
- Total investment capital (estimated): 8,000 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Unit proposes project: Management Board of Economic Zones of Ca Mau Province.
8. Investment in Song Doc Service - Residential - Industrial Zone.
- Location: Song Doc Town, Tran Van Thoi District, Ca Mau Province.
- Scale: 40.59ha.
- Objectives of the project: Development of residential and resettlement areas for specialists, labors working in the Industrial Zone.
- Total investment capital (estimated): 400 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Unit proposes project: Management Board of Economic Zones of Ca Mau Province.
9. Hoa Thanh Handicraft Industry Cluster, Ca Mau City.
- Location: Hoa Thanh Commune, Ca Mau City, Ca Mau Province.
- Scale: about 29.15ha.
- Objectives of the project: Construction investment of the infrastructure of Hoa Thanh Handicraft Industry Cluster synchronously to attract secondary investment projects in the Industrial Cluster.
- Total investment capital (estimated): 300 - 500 billion dong.
- Form of investment: BOT.
- Proposing Unit: People’s Committee of Ca Mau City.
Note: For more information on the investor, please contact:
- Trade, Tourism and Investment Promotion Center of Ca Mau Province.
+ Tel.: (84) 0780 3817533 - 3817057; Fax: (84) 0780 3827893.
+ Email: ctipdautu@gmail.com
B. Production and processing industrial sector (8 projects).
1. Investment in a pre-stressed centrifugal concrete factory.
- Location: Khanh An Industrial Zone, Khanh An Commune, U Minh District, Ca Mau Province.
- Scale: 5ha.
- Capacity: 30,000m3 concrete per year.
- Objectives of the project: Development of construction industry to meet development investment needs of the province; contribute to resolve employment matter for local laborers.
- Total investment capital (estimated): 100 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Proposing unit: Management Board of Economic Zones of Ca Mau Province.
2. Investment in new construction material - new technology manufacturing factory.
- Location: Khanh An Industrial Zone, Khanh An Commune, U Minh District, Ca Mau Province.
- Scale: 5ha.
- Objectives of the project: Development of construction industry to supply materials to meet residential area development needs in the province; contribute to resolve employment matter for local laborers.
- Total investment capital (estimated): 190 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Proposing unit: Management Board of Economic Zones of Ca Mau Province.
3. Investment inpackage manufacturing factory.
- Location: Khanh An Industrial Zone, Khanh An Commune, U Minh District, Ca Mau Province.
- Scale: 6ha.
- Capacity: 2 million units per year.
- Objectives of the project: Ensure the provision of package for factories in the inudstrial zone; contribute to resolve employment matter for local laborers.
- Total investment capital (estimated): 100 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Proposing unit: Management Board of Economic Zones of Ca Mau Province.
4. Investment in shipbuilding and repair factory.
- Location: Song Doc Industrial Zone, Song Doc Town and Khanh Hai Commune; Tran Van Thoi District, Ca Mau Province.
- Scale: 5ha.
- Capacity: Build 100 vessels per year; maintain and repair 200 vessels per year.
- Objectives of the project: Enhance the ability to supply and meet aqua-cultural product farming needs; contribute to resolve employment matter for local laborers.
- Total investment capital (estimated): 100 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Proposing unit: Management Board of Economic Zones of Ca Mau Province.
5. Investment project of a food processing and aquaculture factory.
- Location: Hoa Trung Industrial Zone, Luong The Tran Commune, Cai Nuoc District, Ca Mau Province.
- Scale: 2ha.
- Capacity: 20,000 tons per year.
- Objectives of the project: Meet local needs of food for aquaculture; contribute to lower price and cost of transport, increase profit; contribute to resolve employment matter for local laborers.
- Total investment capital (estimated): 100 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Proposing unit: Management Board of Economic Zones of Ca Mau Province.
6. Investment construction project of Song Doc Canned Fish processing factory.
- Location: Song Doc Industrial Zone, Song Doc Town and Khanh Hai Commune, Tran Van Thoi District, Ca Mau Province.
- Scale: 3ha.
- Capacity: 10,000 tons per year.
- Objectives of the project: Enhance value of fishery products; increase ratio of industrial value and export value; resolve employment matter for local laborers.
- Total investment capital (estimated): 100 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Proposing unit: Management Board of Economic Zones of Ca Mau Province.
7. Investment project of chemical and bio-product manufacturing factory.
- Location: Hoa Trung Industrial Zone, Luong The Tran Commune, Cai Nuoc District, Ca Mau Province.
- Scale: 2ha.
- Capacity: 10,000 tons per year.
- Objectives of the project: Develop local industry, meet the needs of agriculture, forestry and fishery production; contribute to resolve employment matter for local laborers.
- Total investment capital (estimated): 100 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Proposing unit: Management Board of Economic Zones of Ca Mau Province.
8. PB, MDF, HDF man-made board manufacturing factory.
- Location: Khanh An Industial Zone, Khanh An Commune, U Minh District, Ca Mau Province.
- Scale: 20ha.
- Capacity: 60,000m3 per year.
- Objectives of the project: Use readily planted wooden materials to produce high value products for export and domestic use purposes.
- Total investment capital (estimated): 800 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Proposing unit: Department of Agriculture and Rural Development of Ca Mau Province.
Note: For more information on the investor, please contact:
- Trade, Tourism and Investment Promotion Center of Ca Mau Province.
+Tel.: (84) 0780 3817533 - 3817057; Fax: (84) 0780 3827893.
+ Email: ctipdautu@gmail.com
C. Traffic and transport fields (15 projects).
1. Upgrade, expand of Tac Thu - Rach Rang - Song Doc Road.
- Location: Tran Van Thoi and U Minh District, Ca Mau Province.
- Estimated scale:
+ Road length: 38km.
+ Road class: IV.
- Objectives of the project: This is key road to connect the traffic from Ca Mau City to Song Doc Town, contributing to complete traffic system of the province and better serve the transport of goods and passengers along this route and in the region.
- Total investment capital (estimated): 1,320 billion dong.
- Form of investment: BOT.
- Proposing unit: Department of Transport of Ca Mau Province.
2. Upgrade and expand of Ca Mau - Dam Doi Road.
- Location: Ca Mau City and Dam Doi District, Ca Mau Province.
- Estimated scale:
+ Road length: 23,18km (including Hoa Trung Bridge).
+ Road class: IV, plain road.
- Objectives of the project: As Dam Doi is a coastal district of the province, its infrastructure needs to be invested to facilitate conditions for socio-economic development and traffic infrastructure in particular to connect to adjacent areas. Therefore, upgrading and expanding Ca Mau - Dam Doi Road is one of favorable conditions for socio-economic development of the province and region as a whole.
- Total investment capital (estimated): 1,340 billion dong.
- Form of investment: BOT.
- Proposing unit: Department of Transport of Ca Mau Province.
3. Upgrade and expand of U Minh - Khanh Hoi Road.
- Location: U Minh District, Ca Mau Province.
- Estimated scale:
+ Road length: 17,2km.
+ Road class: IV, plain road.
- Objectives of the project: U Minh - Khanh Hoi is the only route linking U Minh town to the center of Khanh Hoi commune, currently, traffic load on this route is increasing more and more. Therefore, constructing this route will facilitate favorable conditions for transporting goods and passengers and help promote socio-economic development of the locality.
- Total investment capital (estimated): 250 billion dong.
- Form of invetsment: BOT.
- Proposing unit: Department of Transport of Ca Mau Province.
4. Upgrade and expand of Lang Tram -Thoi Binh Road.
- Location: Thoi Binh District, Ca Mau Province.
- Estimated scale:
+ Road length: 14,3km.
+ Road class: IV, plain road.
- Objectives of the project: Contribute to complete traffic system of the province; better support the transport of goods and passengers from Thoi Binh town to Ca Mau city.
- Total investment capital (estimated): 170 billion dong.
- Form of invetsment: BOT.
- Proposing unit: Department of Transport of Ca Mau Province.
5. Upgrade and expand of Tri Phai - Thoi Binh Road.
- Location: Thoi Binh District, Ca Mau Province.
- Estimated scale:
+ Road length: 9,3km.
+ Road class: IV, plain road.
- Objectives of the province: Contribute to complete traffic system of the province; better support the transport of goods and passengers along the route and in the region. This is also the route connecting National Road 63 to Kien Giang.
- Total investment capital (estimated): 76 billion dong.
- Form of invetsment: PPP.
- Proposing unit: Department of Transport of Ca Mau Province.
6. Road connecting national highway to Ca Mau City.
- Location: Ca Mau City, Ca Mau Province.
- Estimated scale:
+ Construction type: Urban main road Class II, design speed: v = 80km/h.
+ Road length: 4,1km.
+ Width of road bed: Bbed = 40m.
+ Width of road surface: Bsurface = 6 x 3,75 = 22,5m (6 lanes).
+ Width of center barrier: 2m.
+ Width of safety line: 0,5 x 4 = 2m.
+ Width of pavement: 2 x 6,75 = 13,5m.
- Objectives of the project: Contribute to complete the infrastructure, facilitate conditions to develop and expand Ca Mau City to the North and North East. Connect the traffic between Ca Mau City and National Roads across the City, rapidly improve the ability to transport goods, passengers; contribute to socio-economic development of the province.
- Total investment capital (estimated): 618 billion dong.
- Form of invetsment: PPP.
- Proposing unit: Department of Transport of Ca Mau Province.
7. Ceter road to the North side of Song Doc Town.
- Location: Tran Van Thoi District, Ca Mau Province.
- Estimated scale:
+ Construction type: urban main road, design speed: v = 60km/h.
+ Road length: 4,58km.
* Section from Km0 + 00 – Km0 + 225,24: Construct 02 lanes, each lane has a width of 7m, each lane has following dimensions:
+ Width of road bed: Bbed = 9m.
+ Width of road surface: B surface = 7m.
+ Width of land margin: Bmargin = 2 x 1m.
* Section from Km0 + 225,24 – km3 + 251,65 and Km4 + 429,59 – Km5 + 755: Construct 01lane.
+ Width of road bed: Bbed = 16m.
+ Width of road surface: B surface = 7m.
+ Width of pavement: B pavement = 8,0m.
+ Width of land margin: Bmargin = 1,0m.
- Objectives of the project: Meet traffic needs in Song Doc Town for adjacent areas and to Ca Mau City. Gradually improve the infrastructure, promote economic - cutural - social development; contribute to develop Song Doc Town to a Class-IV urban area in the future.
- Total investment capital (estimated): 277 billion dong.
- Form of invetsment: PPP.
- Proposing unit: Department of Transport of Ca Mau Province.
8. Cho Hoi - Ranh Hat Road.
- Location: Thoi Binh District, Ca Mau Province.
- Estimated scale:
+ Class VI, plain road (design speed: 30km/h);
+ Road length: 5,61km.
+ Width of road surface: 3,5m.
+ Width of land margin: 2 x 1,5m = 3,0m.
+ Width of strengthented land margin: 2 x 0,5m = 1,0m.
+ Width of road bed: 6,5m.
- Objectives of the project:
+ Correct the problem of road degeneration, enhance road quality, satisfy increasing traffic needs. Construct new bridges with synchronous scale and load to ensure smooth and continous traffic flow on the whole route.
+ Facilitate conditions for development and transport to the East, Northeast and North of Ca Mau Province. Then, gradually complete traffic infrastructure; enhance the ability to transport goods and passengers; contribute to local socio-economic development.
- Total investment capital (estimated): 80 billion dong.
- Form of investment: PPP.
- Proposing unit: Department of Transport of Ca Mau Province.
9. Dien Co - Ngang canal Route.
- Location: Vam Dinh Hamlet, Phu Thuan Commune, Phu Tan District, Ca Mau Province.
- Estimated scale: 12,600m2
- Construction work: Total length of the route: 6,300m, descending road surface structure; A reinforced concrete (RC) of 1-2 grade 200; An intermediate rubber layer between RC and sand layers; a 5cm-thick sand layer, existing soil bed.
- Objectives of the project: Invest in the construction of rural traffic infrastructure is essential and pratical to serve traffic and domestic needs of local people and facilitate the exchange and trade of products with adjacent areas, contributing to socio-economic development as well as facilitate conditions to achieve one of the targets of the National Target Program about constructing new rural area.
- Total investment capital (estimated): 3 billion dong.
- Form of investment: Using 100% foreign invested capital or owner’s capital.
- Proposing unit: People’s Committee of Phu Tan District.
10. Construction of Vam Dam Bidge.
- Location: Dam Doi and Nam Can Districts, Ca Mau Pprovince.
- Estimated scale: Permanent RC bridge; load HL93; length 300m; width 9m; Htt=6,0; Btt=50m.
- Objectives of the project:
+ Create smooth traffic between the East - West of Vam Dam River and the region; develop inter-district traffic system, gradually complete traffic system and better serve traffic needs of local province and contribute to economic-cultural-social development of the local province.
+ The bridge is expected to travel across Vam Dam River to connect Nguyen Huan Commune, Dam Doi District to Tam Giang Dong Commune, Nam Can District; scale: class VI, plain road.
- Total investment capital (estimated): 115 billion dong.
- Form of investment: PPP.
- Proposing unit: Department of Transport of Ca Mau Province.
11. Construction of Ganh Hao gate bridge.
- Location: Dam Doi District, Ca Mau Province and Dong Hai District, Bac Lieu Province.
- Estimated scale: Permanent RC bridge; load HL93; length 400m; width 9m; Htt=9m; Btt=50m.
- Objectives of the project: Create smooth traffic between the East and West of Ganh Gao River and the region; develop inter-provincial traffic system; gradually complete traffic system and better serve traffic needs in the region and contribute to economic-cultural-social development of Ca Mau and Bac Lieu provinces.
- Total investment capital (estimated): 350 billion dong.
- Form of investment: BOT.
- Proposing unit: Department of Transport of Ca Mau Province.
12. Construction of a bridge across Ong Doc River.
- Location: Tran Van Thoi District, Ca Mau Province.
- Estimated scale: Permanent RC bridge; load HL93; length 675,5m; width 9m; Htt=9m; Btt=50m.
- Objectives of the project: Construct a bridge across Ong Doc River to facilitate conditions for development on the North and South banks of Ong Doc River and facilitate smooth transport of goods from Western coastal economic areas to Nam Can Port. Also, this construction work is located on the East coastal route.
- Total investment capital (estimated): 490 billion dong.
- Form of investment: BOT.
- Proposing unit: Department of Transport of Ca Mau Province.
13. Construction of a bridge across General Hospital of the District (design documents have been approved).
- Location: Hamlet 4, Dam Doi Town, Dam Doi District, Ca mau Province.
- Investment scale:
+ Length: 120m, width: 1,5m.
+ Bridge structure: cable-stayed.
+ Traffic load: bicycles and walkers.
- Total investment capital (estimated): 2,5 billion dong.
- Form of investment: BOT
- Proposing unit: People's Committee of Dam Doi district.
14. Construction of Quan Lo Phung Hiep Station.
- Location: Northeastern gate urban area, extended Tran Hung Dao Street - Tan Thanh Commune, Ca Mau City, Ca Mau Province.
- Estimated scale: Class I Station, Class II passenger terminal.
- Objectives of the project: Quan lo Phung Hiep Station Port is the largest terminal of Ca Mau City in particular and Ca Mau Province in general. It locates in Quan Lo Phung Hiep road, a key road of Mekong River Delta in the future. For increasing needs of traffic and transport of goods, in 2020, it is essential to orient to develop Quan lo Phung Hiep Station to ensure socio-economic development of the local province.
- Total investment capital (estimated): 100 billion dong.
- Form of investment: BOT.
- Proposing unit: Department of Transport of Ca Mau Province.
15. Construction of a ferry berth and a ferry across Ong Doc River.
- Location: Tran Van Thoi District, Ca Mau Province.
- Estimated scale:
+ Width of ferry berth: 10m.
+ Width of route into the berth: 6,5m.
- Objectives of the project: During the construction of a bridge across Ong Doc River, it is important to construct a ferry berth and ferry across Ong Doc River to facilitate the development of both Northern and Southern banks of Ong Doc River, facilitate the transport of goods and passengers, promote local socio-economic development.
- Total investment capital (estimated): 17,5 billion dong.
- Form of investment: BOT.
- Proposing unit: Department of Transport of Ca Mau Province.
Note: For more information on the investor, please contact:
- Trade, Tourism and investment Promotion Center of Ca Mau Province.
+ Tel.: (84) 0780 3817533 - 3817057 ; Fax: (84) 0780 3827893.
+ Email: ctipdautu@gmail.com